Recent Pending Commercial Applications — Westminster
6 Bourlet Close London W1W 7BN
Alterations to a 4 storey warehouse to include changes to rear fenestration, the formation of a small external plant, replacement of existing lanterns with walk on glass roof lights, new decking to existing roof terrace and changes to the existing mansard to allow the formation of new bifolding doors.
Received 24 Aug 2026
Washington House 40 - 41 Conduit Street London W1S 2YQ
Use of part basement and part ground floor as dual alternative restaurant or retail (Class E) and use of part basement ground and first to sixth floors as offices (Class E), provisions for cycle storage, refuse and servicing at mezzanine level; demolition of existing roof level plant area; various extensions to the building including rear infill extension at mezzanine level, rear extension at 4th and 5th floor levels, front side and rear extensions to the 6th floor level, construction of a 7th storey extension all to provide additional office (Class E) floorspace; replacement of the rear curtain wall facade at mezzanine to 3rd floor levels; the replacement of plant within an acoustic enclosure at roof level; reconfiguration of the ground floor Conduit Street frontage and other associated development.
Received 21 Aug 2026
Unit 5 West Building Zig Zag Building 70 Victoria Street London SW1E 6SQ
Replacement planter screens to provide integral glazing, frames and new gate to existing restaurant outdoor terrace.
Received 19 Aug 2026
Leicester Square London WC2H 7LE
Temporary use of Leicester Square Gardens for the annual Skate Leicester Square event for three consecutive winter seasons commencing in 2026, 2027 and 2028.The proposed development comprises the annual installation of temporary structures and facilities, including an outdoor ice rink, boot room marquee, box office, Christmas market stalls, bars, food units, storage containers, ancillary offices, temporary hoarding and signage, together with associated operational infrastructure and works.The temporary structures and facilities will be installed, operated and subsequently removed during each winter season, with the Gardens reinstated following the completion of each annual event. The permission sought relates to the following three event periods:? Winter 2026/27? Winter 2027/28? Winter 2028/29For each year, installation will take place during October, the event will operate principally between November and early January, and deinstallation and reinstatement will be completed during January. Full annual installation, operational and deinstallation dates will be provided within the supporting documentation.
Received 17 Aug 2026
3 Cavendish Square London W1G 0LB
Internal fit out of office space on the fourth and fifth floor level.
Received 14 Aug 2026
Holiday Villa Hotel 35 - 39 Leinster Gardens London W2 3AN
Internal refurbishment and reconfiguration comprising the selective removal and alteration of internal walls to facilitate the revised hotel layout; removal of later twentieth-century alterations; rationalisation of floor levels; replacement and reconfiguration of lift and secondary stair arrangements; retention, repair and restoration of surviving historic fabric, including original staircases, chimney breast features and basement vaults; reinstatement of front lightwells; associated structural works; and all other ancillary works in connection with the continued use of the property as a hotel (Class C1). (Linked with 26/05523/FULL)
Received 13 Aug 2026
Get notified about new applications
Metis monitors 44+ councils and alerts you the moment a relevant planning application is submitted.