Recent Pending Infrastructure Applications โ Westminster
201 - 203 Great Portland Street London W1W 5AB
Triple alternative use of Devonshire House and ground and upper floors of 201 Great Portland Street for either office (Class E), medical consulting rooms (Class E) or hospital accommodation (Class C2) in association with the adjacent Portland Hospital.
Received 10 Jul 2025
Essendine Primary School Essendine Road London W9 2LR
Internal works to two buildings on the Essendine Primary School site - the Main Building, and the Early Learning Centre (Handicraft Building). Works consist of (a) Removal of all existing fire alarm systems and equipment that is now obsolete, (b) Installation of full replacement L2 fire alarm system with addressable panel, including all cabling and system components and accessories; (c) Necessary builders' works including fire-stopping penetrations and fixing system components, in line with (a) and (b) above. External siting of fire alarm sounders.
Received 27 Jun 2025
Site 117-125 Bayswater Rd 2-6 Queensway Basement Car Park Consort House And 7 Fosbury Mews London
Use of part ground floor and Levels B1 to B2 as a healthcare facility (Use Class E) and associated works.
Received 25 Jun 2025
Ground Floor 35 Weymouth Street London W1G 8BJ
Demolition of existing plant enclosure and part first floor and replacement with new plant and plant enclosure to the rear of 35-37 Weymouth Street, including extension and alterations at first floor to enlarge the existing hospital accommodation (Class C2). Alteration to the Wimpole Mews Elevation frontage including the installation of replacement louvres, removal of railings and addition of wall mounted planters.
Received 19 May 2025
Essendine Primary School Essendine Road London W9 2LR
Internal works to the Main Building at Essendine Primary school (only) consisting of (a) the removal of all existing modern radiators and radiator covers and replacement with new radiators with protective cage covers; (b) the removal and replacement of existing heating system pipework serving the radiators with new and insulation of the new pipework; (c) necessary builders' works including opening up of risers in connection with (a) and (b).
Received 19 Mar 2025
Hallfield Primary School Porchester Gardens London W2 6JJ
Proposed external learning facilities and play equipment on the existing external play area at Acorns and Chestnut ASD provision at Hallfield Primary School. (Linked to 24/06082/FULL)
Received 2 Sep 2024
Get notified about new applications
MetisOS monitors 27+ councils and alerts you the moment a relevant planning application is submitted.